Customization: | Available |
---|---|
Form: | Ring |
Structure Feature: | Ring Form Filler |
Still deciding? Get samples of US$ 1/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Plastic Intalox Saddle is made from heat resistant and chemical corrosion resistant plastics, including polypropylene (PP),polyvinyl chloride (PVC), chloridized polyvinyl chloride (CPVC) and polyvinylidene fluoride (PVDF). It has features such as large void space, low pressure drop, low mass-transfer unit height, high flooding point, uniform gas-liquid contact, small specific gravity, high mass transfer efficiency and so on, and the application temperature in media ranges from 60to 280ºC. For these reasons it is widely used in the packing towers in petroleum industry, chemical industry, alkali-Chloride industry, coal gas industry and environmental protection, etc.
Plastic Intalox Saddle is a combination of the ring and the saddle, which benefits the advantages of the two. This structure helps liquid distribution and enlarges the quantities of gas holes. The Intalox Saddle Ring has less resistance, bigger flux and higher efficiency than the Pall Ring. It is one of the most widely used packing with good hardness. It has low pressure, big flux and high efficiency of mass transfer, and it is easy to manipulate
Product Name | Plastic Intalox Saddle | ||||||
Material | PP,PE,PVC,CPVC,PVDF ,etc | ||||||
Life Span | >3 years | ||||||
Size Inch/mm |
Surface Area m2/m3 |
Void Volume % |
Packing Number pieces/ m3 |
Packing Density Kg/m3 |
Dry Packing Factor m-1 |
||
1" | 25×12.5×1.2 | 288 | 85 | 97680 | 102 | 473 | |
1-1/2" | 38×19×1.2 | 265 | 95 | 25200 | 63 | 405 | |
2" | 50×25×1.5 | 250 | 96 | 9400 | 75 | 323 | |
3" | 76×38×2 | 200 | 97 | 3700 | 60 | 289 | |
Feature | High void ratio, low pressure drop, low mass-transfer unit height, high flooding point, uniform gas-liquid contact, small specific gravity, high efficiency of mass transfer. | ||||||
Advantage | 1. Their special structure make it has big flux, low pressure drop, good anti-impaction capability. 2. Strong resistance to chemical corrosion, large void space. energy saving, low operation cost and easy to be load and unload. |
||||||
Application | These various plastic tower packing are widely used in petroleum and chemical,alkali chloride,gas and environmental protection industries with max. temperature of 280°. |
About US
1: Are you a manufacture or trader?
We are a professional manufacturer over 20 years
2:Where is your company? And visit?
Located in Xiangdong Industrial Park, Pingxiang City, Jiangxi Province.Welcome you to visit
3:Payment way
For oversea market, 40% advanced payment and 60% against copy of B/L or negotiation with you
4: After sales service
Please watch our related description
5:How long does it take to receive a reply after sending an inquiry?
24 hours. For busy, 48 hours.
6:Working time
A.M 8:00-P.M.5:00. However, for any question from internet, telephone,wechat and so on, answer you immediately.
7:Third-party test?
If you need third-party testing, we will contact with them to do it.
8: QC
Pre-sales: Material test, adopt Olympus spectrometer,material test report, third party test(necessary)
In-sales: test product material, weight, size, bulk number,pressure,Temperature resistance
After-sales:
Providing professional installation guidance.
If any problem, offer suitable opinion to solve.
About product
1:customized and logo?
Yes, we can do it
2:Package
Small plastic woven bag, super sack, cartons or upon your requirement
3:Certification
If necessary, we will entrust third-party to do it
4: MOQ
1 cubic meter
5:Production time
5-7 days to meet one 20 FCL container loading requirement
6:How much is the proofing fee? How long does the sample come out?
If only need 3D proofing, 5-7 days will finish after confirming drawing. If only need injected sample, 30-40 days will finish after confirming mold
7:HS code
Common customs codes is 3926909090,8419909000,6903200000,8419909000 and so on.